print page

Three major projects for the UK Continental Shelf (UKCS) representing some £3.5 billion investment*

• Securing future indigenous energy supplies to the UK
• Strengthening our presence and commitment to the UK through a long-term investment plan on   the UKCS
• Applying our well established presence in the North Sea and our technological expertise to seek innovative solutions 

* operated investment

Located some 125km north-west of the Shetland Islands, the Laggan and Tormore fields represent the future of the UK oil and gas industry

  • Pioneering development opening up a new frontier region
  • Unlocking the area’s potential for further opportunities
  • One of the largest infrastructure projects in recent years
  • The fields contain more than 1 trillion cubic feet of gas, plus some condensate
  • Total (80% interest) will develop Laggan-Tormore with partner, Dong (20% interest)
  • First gas planned for 2014

www.laggan-tormore.com 

West Franklin Phase 2

• Deepest, highest pressure/highest temperature field developed on the UKCS so far
• Aimed at accessing reserves currently estimated to be around 85 million barrels of oil equivalent (boe)
• First production expected in Q4 2013 and should reach 40,000 boe per day
• Extending the life of our Elgin/Franklin hub

Islay

• Subsea satellite of Alywn some 440 km north-east of Aberdeen
• Estimated reserves of near to 17 million barrels of oil equaivalent
• Estimated peak production of 2.5 million standard cubic metres per day plus associated condensates