Central Graben
Icop Elgin/Franklin infrastructure
Nothern north sea
West of Shetland
St Fergus Terminal
What we do
The history
FTS
MCP-01
Vesterled
Facts & Figures
Icop St fergus gas terminal
Non-operated
  
Statutory Consultation of MCP-01 Decommissioning Programme
From 9th March to 25th April 2005

On behalf of the owners of the MCP-01 facility, Total E&P UK Limited launched on 9th March 2005 the statutory consultation of the MCP-01 Decommissioning lasting to 25th April 2005. By clicking here you can download the full Decommissioning Programme (pdf 5,608 KB).

Because the UK and Norwegian authorities have decided to take a joint approach to the decommissioning of MCP-01, under the provision of the Frigg Treaty, the UK’s usual 30-day consultation period has been extended to 45 days to accommodate Norwegian practice who would normally have longer consultation period.

The recommended disposal arrangements for the MCP-01 facilities based on a thorough comparative assessment of all the options, are as follows:
· the topsides facilities to be removed to shore for disposal,
· the concrete substructure should be suitably marked and left in place following the removal of the external steelwork, and
· as much of the equipment and materials removed as practicable will be reused or recycled.

The document is quite lengthy and will take time to read through. We have therefore made a Fact Sheet No. 2 summarising the main elements in the Decommissioning Programme.

A CD copy may be requested, or a hard copy of the Programme can be inspected, at the following location during office hours:

Address:
Total E&P UK Limited,
Crawpeel Road,
Altens Industrial Estate,
Aberdeen AB12 3FG
Contact: Christine Jones
Tel +44(0)1224 297827
mcp-01.total@total.com

Representations regarding the MCP-01 Decommissioning Programme should be submitted in writing to Christine Jones at Total E&P UK Limited, Crawpeel Road, Altens Industrial Estate, Aberdeen AB12 3FG where they should be received by Monday 25th April and should state the grounds upon which any representations are being made.